What are the main points of construction quality control during the construction of geomembrane composite with non-woven?

Release time:2020-4-7    This article is read :3664 Times

geomembrane composite with non-woven

       What are the main points of construction quality control during the construction of geomembrane composite with non-woven?During the construction of composite geomembrane, regarding the quality control of construction, what are the control points that need our attention? Taian Hongyuan Geosynthetics Co., ltd. is a composite geomembrane wholesaler. The editor will take you to understand the composite geomembrane together. What are the main points of construction quality control during construction!

       1. When the lake bottom is leveled, stones, branches and all sharp and hard objects need to be completely removed to prevent damage to the composite geomembrane. Due to the large water content of the lake bottom soil, the soft parts should be dug out and backfilled to tamping, and the rubber soil should be dug out and backfilled with 3: 7 lime soil.

       2. The laying of the protective layer must be done with a flat shot.

       3. In order to ensure the welding quality of the geomembrane, the weld surface of the geomembrane should be cleaned. Adjust the welding temperature and line welding speed at any time according to the air temperature, wind direction and wind force; often remove the residue of the geomembrane material adhering to the surface of the rubber wheel of the welding machine and the surface of the hot wedge to keep the surface clean; the substrate must be flat and hard when welding. The seam lap surface must be smooth to prevent the weld from wrinkling.

       4. Do not damage the composite geomembrane when laying the protective layer and filling the anchoring end with concrete. After each process is completed, it must be approved by the site supervision engineer before proceeding to the next process.

What are the main points of construction quality control during the construction of geomembrane composite with non-woven?
Previous:Requirement of base surface when laying GCLnext:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.sdhxnjy.com

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 九色porny丨自拍视频 | 中文字幕一区二区人妻 | 久热超碰 | 色中文网 | 国内综合精品午夜久久资源 | 爱久久av一区二区三区 | 国产亲子乱 | 中文字幕永久视频在线看 | 久久精品综合网 | 黄色成人免费视频 | 免费看片在线观看网站 | 6699嫩草久久久精品影院 | 日产精致一致六区麻豆 | 18一20岁毛毛片 | 成年人激情网 | 国产寡妇XXXX猛交巴巴 | 国产精品黄网在线播放 | 国产高清视频在线观看播放 | 殴美黄色录像 | 深夜激情视频 | 奇米综合 | 国产大片成人午夜片 | 草免费视频| 人与拘一级a毛片 | 男人女人真曰批视频播放全过程 | 国产免费av国片精品草莓男男 | 欧美专区日韩视频人妻 | 欧美S码亚洲码精品M码 | 国内一级黄色 | 2021年最新最全婷婷丁香 | 亚洲三区精品 | 久久女女| 免费国产成人 | 亚洲激情在线观看视频 | 99爱国产| 国产一区999| 久草在线观看福利视频 | 国产91区精品福利在线社区 | 日本暖暖视频 | 一级片福利 | 国产99久久久 |