久久九九热_ASS鲜嫩鲜嫩年轻少妇PICS_草留视频_中文字幕日韩一级_亚洲欧洲AV综合色无码_av观看免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

Requirement of base surface when laying GCL

Release time:2020-4-7    This article is read :3187 Times

GCL manufacturer

       Requirement of base surface when laying GCL

       When laying the GCL, what are the laying requirements when laying the base surface? As a GCL manufacturer, Taian Hongyuan Geosynthetics Co., ltd. will take you to understand the GCL when laying. What are the requirements of the base!

       1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL or the upper layer of geosynthetics.

       2. The surface of the foundation soil must be flat and even, and the slope and elevation should be within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements. The base surface should facilitate the laying of GCL, HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

       3. Before laying the GCL, whether the upper surface of the foundation of the soil cushion GCL should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL.

       4. After the daily work, we prepare a signed foundation soil surface permit certificate, which must be signed by the owner ’s representative and then handed over to the supervision engineer.

       5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL that has been accepted becomes unqualified, the installed GCL must be reopened and prepared again 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

Requirement of base surface when laying GCL
Previous:What is the inherent role of geomembrane composite with non-woven anchor?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.sdhxnjy.com

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 国产精品一区二区在线观看99 | 人妻少妇啊灬啊灬用力啊快 | 全部免费毛片在线播放网站 | 偷拍亚洲色图 | 国产成人MV在线播放 | 一区二区三区视频免费 | 三级理论日韩欧美 | 久久久精品欧美一区二区免费 | 久久精品伊人波多野结衣 | 337p日本大胆欧美人 | 日本韩国在线视频 | 亚洲中文字幕成人无码 | 国产又粗又硬又长又爽的视频 | 一级全免费视频播放 | 欧美一级在线视频 | 超碰资源在线 | 韩国色网 | 精品毛片视频 | 亚洲女同精品一区二区 | 在线观看视频99 | 人人人澡人人肉久久精品 | 天天干夜夜操 | 色18亚洲美女 | 好紧好湿好爽免费视频在线观看 | 九九天堂 | 热re91久久精品国产99热 | 国产永久免费高清在线观看 | 国产高清激情在线观看 | 精品亚洲国产成人AV | 香蕉污视频在线观看 | 欧美精品久久久免费观看 | 有码一区| 高清国产视频在线 | 丝袜+亚洲+另类+欧美+变态 | 大地资源视频在线观看免费高清 | 日本无码人妻丰满熟妇A片 久久一区二区三区精华液 欧美色综合影院 | china熟女熟妇乱老女人 | 日韩观看 | 成人免费无码成人影院日韩 | 国产精品久久久久久久岛一本蜜乳 | 欧美中文字幕一区二区三区亚洲 |