久久九九热_ASS鲜嫩鲜嫩年轻少妇PICS_草留视频_中文字幕日韩一级_亚洲欧洲AV综合色无码_av观看免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

What are the requirements for the base surface when laying GCLs?

Release time:2020-4-7    This article is read :3963 Times

Taian Hongyuan Geosynthetics Co., ltd.

Taian Hongyuan Geosynthetics Co., ltd. has been engaged in the production and sales of GCLs for many years, what are the requirements when laying the base surface. Taian Hongyuan Geotechnical Materials Co., Ltd., as a manufacturer of GCLs, let the editors take you together to understand what are the requirements for the base surface when laying GCLs?

1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL (GCL) or the upper layer of geosynthetics.

2. The surface of the foundation soil needs to be flat, uniform and the slope and elevation are within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements.

The base surface should facilitate the laying of GCL (GCL), HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

3. Before laying the GCL (GCL), whether the upper surface of the foundation of the soil cushion (GCL) should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL (GCL).

4. After the daily work, we prepare a signed foundation soil surface permit certificate, which needs to be signed by the owner ’s representative and then handed over to the supervision engineer.

5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL (GCL) that has been accepted becomes unqualified, the installed GCL (GCL) needs to be reopened and re-prepared 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

What are the requirements for the base surface when laying GCLs?
Previous:How to check the quality of the construction of GCL?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.sdhxnjy.com

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 把插八插露脸对白内射 | 久草免费公开视频 | 小嫩嫩12欧美 | 亚洲精品乱码久久久久久中文字幕 | av一区二 | 先锋影音9porny自拍啪 | 亚洲首页一区任你躁XXXXX | 亚洲国产观看 | 色吊丝AV中文字幕 | 亚洲在线视频一区二区 | 亚洲成人中文字幕在线 | 噼里啪啦免费观看高清动漫 | 97黑人性色浪潮91久久 | 最新av免费看 | 91国偷自产一区二区三区老熟女 | 182在线播放 | 日韩高清国产一区在线 | 伦人伦XXX国产对白 一本久道视频一本久道 | 亚洲av无码国产精品色午夜字幕 | 日本一区二区精品 | 五码亚洲| 私人影院在线观看 | 1000部无遮挡拍拍拍免费视频观看 | 韩国久久精品 | 成人黄网站片免费视频 | 亚洲av人人夜夜澡人人 | 国产亚洲a∨片在线观看 | 亚洲成a人片777777美国 | 精品久久久免费视频 | 中日韩免费毛片 | 日韩在线一 | 成人乱码一区二区三区不卡视频 | 欧美日韩国产精品久久久久 | 欧美熟乱妇 | 欧美日韩成人在线视频 | 天天干夜夜爽 | 精品人妻无码一区二区三区50 | 懂色av一区二区三区蜜臀 | 久草在线观看福利视频 | 国模av在线 | 717影院理论午夜伦八戒秦先生 |