久久九九热_ASS鲜嫩鲜嫩年轻少妇PICS_草留视频_中文字幕日韩一级_亚洲欧洲AV综合色无码_av观看免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

Technical Services Current Position:Home > Technical Services

Transportation, loading and unloading and storage of geosynthetic clay liner(GCL)

Release time:2020-4-7    This article is read :3274 Times

geosynthetic clay liner(GCL)

Transportation, loading and unloading and storage of geosynthetic clay liner(GCL)

1. transport

(1) During long-distance transportation, it should be tightly tied and covered tightly to ensure that the product is not damaged;

(2) Pay attention to waterproof, moisture and corrosion during transportation;

(3) Pay attention to prevent the loss of bentonite particles in the geosynthetic clay liner(GCL) caused by long-distance transportation;

(4) During the transportation of auxiliary materials, the dryness of the auxiliary materials should be maintained to avoid affecting the use effect.

2. Loading and unloading

(1) Mechanized operation is used for the loading and unloading of waterproof materials, and the unified command is conducted by experienced commanders. During the loading and unloading process, sharp objects are prevented from damaging the product and the outer packaging of the product.

(2) When using a forklift or crane to carry the geosynthetic clay liner(GCL), hang the set sling or use a pallet. It is not allowed to use wire ropes or other things to pull up or only hang a little, to prevent damage or deformation of the waterproof blanket;

(3) When unloading the goods, visually inspect each roll of geosynthetic clay liner(GCL) for damage. The damaged ones should be marked and stored separately for further inspection. Repair damaged packaging before storage.

(4) When unloading, please pay attention to whether each roll of waterproof blanket keeps the dryness at the time of leaving the factory. If it is found that there is moisture expansion, it should be selected and placed separately, and contact the manufacturer in time.

3. Storage

(1) The storage of geosynthetic clay liner(GCL) must be moisture-proof, impermeable and waterproof.

(2) When storing geosynthetic clay liner(GCL), the bottom must be cushioned with sleepers or other things, and the height should be determined according to the site conditions. The principle is not to contact water.

(3) geosynthetic clay liner(GCL), including supporting bentonite powder and other auxiliary materials, should be stored in a watertight warehouse. When stacked in the open, they must be tightly covered with waterproof materials such as tarpaulins and films.

(4) The stacking height should not exceed four rolls.

4. Product protection:

(1) In the construction of the waterproof layer or when the waterproof layer has been completed and the protective layer is not completed, it is a critical period for the protection of the finished product. During this period, any unrelated persons are prohibited from entering the scene. For waterproof construction personnel and materials to enter, the principle of handling lightly must be observed, and it is strictly forbidden to show sharp objects hitting the waterproof layer.

(2) Pay attention to avoid damage to the waterproof protective layer during the construction of other processes, and do not damage the non-proof layer. During the construction process, if it is found that the waterproof layer is damaged, it should organize maintenance and repair as soon as possible.

(3) After the construction of the waterproof layer is completed, it is not possible to open holes or drill holes in the waterproof layer to install machinery and equipment. If it is necessary to open holes or drill holes in the waterproof layer, make a record first and arrange for repairs.

(4) The materials should be properly stored, sorted and stacked at the site to prevent moisture and keep away from the fire source. Fire is strictly prohibited.

(5) Prevent equipment from damaging the waterproof layer.

(6) Construction personnel should wear soft rubber-soled shoes, and hard-soled shoes with nails are strictly prohibited.

(7) The stacking materials on the waterproof layer should be handled lightly and paved.

(8) It is strictly forbidden to pile materials or other debris on the completed waterproof layer to prevent damage to the waterproof layer and leave hidden danger of leakage.

(9) If the local waterproof layer is damaged during construction, the technical and quality departments should be notified immediately to take corresponding reinforcement measures to ensure the quality of the waterproof construction.

(10) The waterproof blankets laid on the same day must be covered with backfill or temporary tarpaulins at any time according to the amount of paving; the waterproof blankets should not be covered overnight (mainly to prevent rain at night).

Transportation, loading and unloading and storage of geosynthetic clay liner(GCL)
Previous:Construction site stacking of geosynthetic clay liner(GCL)next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.sdhxnjy.com

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 国产欧美一区二区三区久久手机版 | 殴亚乱色熟一区二区三四区 | 日韩视频在线观看一区 | 妇女性内射冈站HDWWW000 | 人妻无码AV天堂二区网站 | 精品久久久久久无码中文野结衣 | 伊人第四色 | 亚洲精品精华液一区二区 | 91免费看视频 | 亚?成人一区二区三区在线?看 | 2021年最新最全婷婷丁香 | 九九热这里只有精品在线观看 | 国产999精品视频 | 91精品久久久久久综合五月天 | 一区二三区日韩精品 | 婷婷成人丁香五月综合激情 | 国产精品久久三 | 亚洲成在人线AV品善网好看 | 国产无套露脸视频在线观看 | 男女免费观看在线爽爽爽视频 | 欧美精品在线一区 | 中文字幕av一区二区三区免费看 | 精品久久久久一区二区国产 | av午夜久久蜜桃传媒软件 | 免费a网站| 国产黑色丝袜流白浆视频 | 国产人妇三级视频在线观看 | 中文字幕最新 | 肉蒲团从国内封禁到日本成经典 | 韩国av网站在线 | 高清精品自拍亚洲 | 黄色特级片黄色特级片 | 亚洲一卡二卡在线 | 免费av一区二区三区无码 | 五月婷婷俺也去 | 亚洲欧洲高清 | 亚洲成人一区在线 | 99色在线观看 | 青青草免费在线视频播放 | 久久9色 | 日本一区二区三区视频视频 |