久久九九热_ASS鲜嫩鲜嫩年轻少妇PICS_草留视频_中文字幕日韩一级_亚洲欧洲AV综合色无码_av观看免费

phone/wechat/what's app: +86-18653810085

Email: hongyuanmakela@163.com

Taian Hongyuan Geosynthetics Co., Ltd.
Tel:18653810085

News Current Position:Home > News

Requirement of base surface when laying GCL

Release time:2020-4-7    This article is read :3187 Times

GCL manufacturer

       Requirement of base surface when laying GCL

       When laying the GCL, what are the laying requirements when laying the base surface? As a GCL manufacturer, Taian Hongyuan Geosynthetics Co., ltd. will take you to understand the GCL when laying. What are the requirements of the base!

       1. The surface of the foundation soil should be free of mud, water, stones, tree roots, debris and other substances that can damage the GCL or the upper layer of geosynthetics.

       2. The surface of the foundation soil must be flat and even, and the slope and elevation should be within the allowable error range specified in the relevant earthwork technical specifications. The quality of the base surface should meet the design requirements: the bottom surface of the foundation pit, the slope surface and its slope ratio, the solid laid on the side slope, and the treatment of the junction between the slope surface and the bottom surface should all strictly meet the design requirements. The base surface should facilitate the laying of GCL, HDPE geomembrane and geotextile. The base surface should be dry, compacted, smooth, without cracks, without obvious spikes, depressions, and there should be no roots, rubble, stones, steel heads, glass chips within a vertical depth of 25mm. The flatness should be changed gently within the allowable range, the slope is uniform, the slope is consistent, and meets the design requirements of the drawings. The yin and yang corners on the base surface should have a smooth transition, and the radius should not be less than 0.5 meters.

       3. Before laying the GCL, whether the upper surface of the foundation of the soil cushion GCL should be laid meets the design requirements, and agree that the foundation soil surface is allowed to be laid with the GCL.

       4. After the daily work, we prepare a signed foundation soil surface permit certificate, which must be signed by the owner ’s representative and then handed over to the supervision engineer.

       5. If the supervision engineer, the owner or one of us thinks that any of the ground soil surfaces of the GCL that has been accepted becomes unqualified, the installed GCL must be reopened and prepared again 3. Re-check in accordance with the aforementioned acceptance procedures on the foundation.

Requirement of base surface when laying GCL
Previous:What is the inherent role of geomembrane composite with non-woven anchor?next:Construction notes of GCL

Contact Us:

WeChat public account

Taian Hongyuan Geosynthetics Co., Ltd.

Phone / Wechat / What's app:+86-18653810085

Telephone / Fax: + 86-538-6598877

Email:  hongyuanmakela@163.com

Website: www.sdhxnjy.com

Address: Jinghua Industrial Zone, NO. 88 Leigushi Street, Taishan Industrial Park, Taian City, Shandong Province, China

Copyright? Taian Hongyuan Geosynthetics Co., Ltd.            Lugong Network Security No. 37090202000491            Lu ICP No. 16042524-1           公示信息

主站蜘蛛池模板: 有码+日韩+在线观看 | 秋霞鲁丝片成人无码 | 成年人精品视频在线观看 | 久久久女人视频 | 中文字幕亚洲天堂网 | 欧美性20hd另类 | 无码国产精品人妻一区二区 | 韩日精品视频在线观看 | 人妻中文无码就熟专区 | 亚洲AV片不卡无码dvd | 国产综合无码一区二区辣椒 | 91精品国产综合久久久久蜜臀 | 国产综合社区在线视频 | 中国字幕第一页 | 波多野结衣多次高潮三个老人 | 国内自产少妇自拍区免费 | 91在线中文字幕 | 竹菊影视欧美日韩一区二区三区四区五区 | 亚洲精品一区在线 | 久久91麻豆精品一区 | 日本v片在线观看 | 亚洲午夜无码极品久久 | 免费看黄片毛片 | 国产色XX群视频射精 | 国产在线视频网站 | 亚州视频在线 | 大地资源高清播放在线观看视频 | 91网视频在线观看 | a级黄色毛片免费播放视频 久久精品国产视频 | 国产精品186在线观看在线播放 | 99久久久国产精品消防器材 | av在线浏览 | 四季av一区二区三 | 欧美日色| av影片在线一区 | 亚洲欧洲无卡二区视頻 | 在线看免费视频 | 亚洲国产精品久久久久日本竹山梨 | 免费大片av手机看片 | 中文日韩在线观看 | 国产AV无码专区亚洲AV毛片搜 |